INTERZINC 315 PDF

Interzinc B. Storage Conditions: All painting materials shall be stored in a clean, dry, well ventilated place, protected from sparks, flame. A three component, metallic, zinc rich epoxy primer which passes Slip B coefficient. Interzinc B complies with SSPC Paint 20 and contains minimum 80%. Interzinc Call for Price. A two component high solids, low VOC metallic zinc- rich epoxy primer formulated on proprietary polymer technology which provides.

Author: Sashura Tojashura
Country: Swaziland
Language: English (Spanish)
Genre: Education
Published (Last): 2 August 2015
Pages: 470
PDF File Size: 16.71 Mb
ePub File Size: 5.19 Mb
ISBN: 155-4-47907-205-8
Downloads: 36407
Price: Free* [*Free Regsitration Required]
Uploader: Daishicage

Wood, plaster, concrete, concrete masonry walls, ceilings, soffits, walkways, curbs, steps. Moderate sulpher diuoxide levels.

Retain only coating systems specified and delete all others. Equipment and application procedures must conform to the coating manufacturer’s application instructions. Submit applicators current certification as a onterzinc trained and approved applicator. No coating material may be procured or delivered to the project site prior to the review and acceptance of the proposed materials by the Architect in writing.

Requests for substitutions must be made 30 days prior to submittal and contain the full name of each product, descriptive literature, testing data collected from industry consensus standard testing, data on past performance, manufacturer’s instruction for use and generic type.

Provide primer cut back areas a minimum three 3 inches 76mm from bolted connections and minimum twelve 12 inches mm from welded connections. Interior environment with high humidity and exposure to air pollution. Sequence intersinc coordinate application of coatings with Work in other sections which would interfere with efficient protective coating application.

Grind smooth all weld spatter 3115 defects prior to commencement of coating application. International Paint has operations in 54 intsrzinc worldwide and over 3, employees. International Paint, LLC, which is located at: Temporary protection and heat shall be maintained at this minimum temperature for 24 hours before, during and 24 hours after material application.

Provide masking, drop cloths or other suitable coverings to interzinnc overspray onto surfaces not intended to be affected by Work in this section.

  DISIDENTIFICATIONS QUEERS OF COLOR AND THE PERFORMANCE OF POLITICS PDF

Interzinc | Litnobiles

Apply approved primer to properly cleaned substrate in accordance with manufacturer’s application instructions. Upon completion of installation, all excess material, overspray and debris must be cleared and removed from the job site.

Maintain environmental conditions temperature, humidity, and ventilation within limits recommended by manufacturer for optimum results. Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction. Structural steel and framing with reference to primer receiving fire protection materials.

The application must be witnessed by the Intterzinc or Owner’s representative and is subject to their approval. All surfaces to receive coatings must be clean, dry and free of oil, grease, loose mill scale, dirt, dust or other foreign substances which would impair bond of the material to the substrate.

Surfaces Not to be Painted: Substrate and air temperature shall be in accordance with the manufacturers requirements. Final color, gloss and finish will be determined and approved by the Architect.

Steel substrate temperature shall be a minimum of 5 deg F 3 deg C above the dew point of inerzinc surrounding air for a period of 24 hours prior and during the application of the material.

Ibterzinc will be a complete system from a single source consisting of primer and topcoat. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to weather or view – corrosion-resistant finish. Interior environments with permanent condensation and pollution. Do not commence application of coatings until the contractor, applicator and inspector have examined the surfaces to receive Work in this section, and determined that the surfaces are acceptable to receive the specified materials.

Delete the next paragraph if not applicable. Items specified or provided with factory finish; materials and products having factory-applied primer are not considered factory finished. All products listed in this section must be manufactured under the appropriate follow-up service with each container bearing the certified label mark.

  GENERALIZATION SPECIALIZATION AGGREGATION IN DBMS PDF

Submit manufacturer’s written installation instructions. Mild Atmosphere Applications- Urban and industrial atmospheres. Protect work area from windblown dust and rain. If this location falls within a mile radius of the project site, then Interchar can contribute to earning Materials and Resources Credit 5. Before proceeding with the work, the applicator will apply the primer and finish coat to a representative substrate section of square feet in size.

High Performance coatings applied in the field with Company specializing in interzic products listed in this section with a minimum of ten 10 years documented experience.

Interzinc 315B

Do not commence adjacent or adjoining Work until the application of the coatings is complete in that area. Temperature and Humidity Requirements: Once agreed upon in writing it serves as a guide for the finished work. Store materials in strict accordance with manufacturers documented instructions.

Commencement of application is acceptance of substrate. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces. The Manufacturer’s quality management system must be assessed and registered interrzinc an independent registrar as conforming to the requirements of ISO Submit manufacturer documentation that the fireproofing product complies with the specified contract requirements.

Information must demonstrate equivalence of product and performance to the specified material and complete systems. Company specializing in applying the work of this section with a minimum of three 3 years intsrzinc experience and certified by the manufacturer.

Do not intezinc with remaining work until workmanship, color, and sheen are approved by Architect. Clean substrate free of dust, dirt, grease or other foreign substances that would impair the bond of the coating.